BLNG project

  • Bahrain LNG Import Terminal
  • Client : BLNG
  • Location : Muharraq, Bahrain
  • Scope : PAU (FSjRU), 12EA Jetty PAR
  • Special : 7400ton Mega Module
  • Project Period : 2015:12~2019.02

Background

Bahrain LNG Import Terminal includes offshore regasification fixed platform capacity of up to 800 mmscfd for LNG which was designed as module from FEED stage.
To successfully execute this modular project, GMODIS was assigned to develop the entire modularization phase from FEED verification to installation.

Challenge

  • Controll module size and weight
  • Minimize structural reinforcement to secure cost competitiveness versus stick built
  • Meet short delivery schedule

Solution

  • Modularization skills with various experience
  • Transportation analysis skills based on Joint Development Project with DNV
  • Weight control procedure

Result

  • Optimized reinforcement for structural steel
  • Optimized Module Size considering site condition (Barge size, tie-in point with jetty structure, etc.)
  • Fast-track for module fabrication with early engagement
  • Minimize site preparation for transportation
  • Successful transportation with piggy-back method during Monsoon season