Y2C Module

  • Yeosu No.2 Complex Project
  • Client : LG Chemical
  • Location : Ysosu, Korea
  • Scope : 19EA PAS
  • Special : –
  • Project Period : 2018:08~2021.06

Background

Yeosu No.2 Complex project was planned with PAS modules from FEED State. To successfully execute this modular project, GMODIS was assigned to develop the entire modularization phase from FEED to Installation.

Challenge

  • Maximize module size
  • Minimize structural reinforcement to secure cost competitiveness versus stick built
  • Meet short delivery schedule

Solution

  • Modularization skills with various experience
  • Transportation analysis skills based on Joint Development Project with DNV
  • Weight control procedure
  • 3D based simulation (3D Model, Point Cloud)

Result

  • Zero reinforcement for structural steel
  • Optimized Module Size considering site condition (road slope, berth, etc.)
  • Fast-track for module fabrication with early engagement
  • Minimize weighing of module
  • Minimize site preparation for transportation